Kitchen remodeling
Kitchen Remodel Planning Checklist: What to Decide Before Demolition
A practical checklist for planning a kitchen remodel: goals, layout, selections, permits and schedule, before any demolition starts. Read the post
How Long Does a Kitchen Remodel Take?
A typical kitchen remodel takes 4–8 weeks of construction. See the stages, what happens in each one and what can extend the schedule. Read the post
Kitchen Layouts: Galley, L-Shape, U-Shape or Island?
Compare galley, L-shape, U-shape and island kitchen layouts, and learn which one fits your room and the way you cook. Read the post
Kitchen Cabinets: Door Styles, Construction and Finishes
A guide to kitchen cabinet door styles, box construction, finishes and storage features, so you know what to ask before you order. Read the post
Quartz, Granite or Porcelain: Choosing a Kitchen Countertop
Compare quartz, granite, marble and porcelain kitchen countertops by maintenance, heat and stain resistance, and appearance. Read the post
Kitchen Lighting: Task, Ambient and Accent Layers
How to plan kitchen lighting in three layers: recessed ambient light, under-cabinet task light and pendants, with dimmers for each. Read the post
Opening Up a Kitchen: What Removing a Wall Involves
What it takes to open a kitchen to the living area: load-bearing checks, utilities inside the wall, permits and finishing the floor and ceiling. Read the post
Do You Need a Permit to Remodel a Kitchen in South Florida?
When a kitchen remodel needs a permit in South Florida, what inspections cover, and who should pull the permit. Read the post
7 Kitchen Remodeling Mistakes to Avoid
Seven common kitchen remodeling mistakes, from ordering late to skipping the lighting plan, and how to avoid each one. Read the post
Kitchen Remodel Cost: What Affects the Price
What drives kitchen remodel cost: layout changes, cabinets, countertops, appliances, electrical and plumbing, and how to get a fixed written price. Read the post
Kitchen Backsplash Ideas: Tile, Slab and Layout
Kitchen backsplash ideas: subway and mosaic tile, full-height slab, grout color and where the backsplash should start and stop. Read the post
Bathroom remodeling
Bathroom Remodel Planning: Scope, Selections and Schedule
How to plan a bathroom remodel: define the scope, choose tile and fixtures early, and understand the order of work. Read the post
How Long Does a Bathroom Remodel Take?
A typical bathroom remodel takes 4–8 weeks. See each stage, why waterproofing and glass add time, and how to avoid delays. Read the post
Shower Waterproofing: What Goes Behind the Tile
Tile and grout are not waterproof. Learn what a shower waterproofing system includes and what to ask your contractor. Read the post
Walk-In Shower or Tub? How to Decide
Should you replace the tub with a walk-in shower? Compare daily use, accessibility, space and layout before you remodel. Read the post
Bathroom Tile: Porcelain, Marble-Look and Mosaic
A guide to bathroom tile: porcelain, marble-look and mosaic, slip resistance for floors, grout choices and layout patterns. Read the post
Frameless Shower Glass: What to Know Before You Order
How frameless shower glass is measured, the door options, and the hardware and layout details to decide before ordering. Read the post
Small Bathroom Remodel Ideas That Add Space
Ideas for remodeling a small bathroom: floating vanities, clear glass, niches, large-format tile and better lighting. Read the post
Choosing a Bathroom Vanity: Size, Storage and Tops
How to choose a bathroom vanity: single or double, freestanding or floating, drawer storage, and countertop and sink options. Read the post
Bathroom Remodel Cost: What Affects the Price
What drives bathroom remodel cost: moving plumbing, waterproofing, tile, glass, vanity and fixtures, and how to get a fixed written price. Read the post
Primary Bathroom Remodel Ideas
Primary (master) bathroom remodel ideas: walk-in showers, freestanding tubs, double vanities, lighting and storage. Read the post
Home renovation & additions
Home Renovation Planning: Where to Start and What to Expect
How to plan a home renovation: set priorities, define scope room by room, understand permits and a 12–24 week whole-home schedule. Read the post
Renovate or Move? Questions to Ask Before You Decide
Deciding whether to renovate your home or move: location, layout, what can be changed, and what a renovation involves. Read the post
Home Addition Planning: Types, Permits and Timeline
How to plan a home addition in South Florida: room additions, primary suites, second stories, permits, structure and a 12–24 week schedule. Read the post
Second-Story Addition: What to Know Before You Build Up
What a second-story addition involves: structural evaluation, stairs, permits, and what happens to the existing roof and first floor. Read the post
Roofing, windows, doors & stairs
Roof Leak Signs and What to Do First
Common signs of a roof leak, where leaks usually start, what to do right away and when to call a licensed contractor. Read the post
Roof Repair or Replacement: How to Decide
How to decide between roof repair and roof replacement: age, extent of damage, the condition of the deck and underlayment. Read the post
Impact Windows in South Florida: What Homeowners Should Know
A guide to impact windows in South Florida: how laminated glass works, frames, approvals, permits and what installation involves. Read the post
Entry Door Replacement: Materials, Styles and Installation
How to choose a new entry door: wood, fiberglass or impact glass, single or double, hardware, and what installation and finishing involve. Read the post
Staircase Remodel Ideas: Railings, Treads and Entry Steps
Staircase remodel ideas for interior and exterior stairs: new railings, treads, entry steps and safe elevated access. Read the post
Commercial remodeling
Commercial Tenant Build-Out: From Lease to Opening Day
The steps of a commercial tenant build-out: plans and landlord approval, permits, rough-in, framing, finishes, inspections and opening. Read the post
Planning your project
How to Choose a Remodeling Contractor in South Florida
What to check before hiring a remodeling contractor: license, insurance, a written itemized proposal, permits, schedule and warranty. Read the post
What a Fixed, Itemized Remodeling Proposal Should Include
What to look for in a remodeling proposal: itemized scope, materials, what is excluded, schedule, change process and warranty. Read the post
Living at Home During a Kitchen or Bathroom Remodel
How to stay in your home during a kitchen or bathroom remodel: temporary setups, dust control, daily cleanup and communication. Read the post
Request a free estimate
Call (305) 395-7690 or send the estimate form. Licensed & insured · CGC#1521974 · info@polobuilder.com
